Current release
Version 1.0.0
Three coordinated project modes
- Single Distribution Panel Park for one panel and its RV-site distribution.
- Multi-Panel Park for a low-voltage MDP and multiple distribution panels.
- Large MDP & Transformer Park for a 480Y/277V MDP, park-owned transformers, and downstream panels.
Physical RV-site and branch modeling
- Direct-fed single- or dual-sided physical pedestals with one panel-to-pedestal supply.
- Ordered one-source continuing-radial runs with one or two separately counted sites at each pedestal, downstream demand by segment, cumulative voltage drop, and a uniform run conductor arrangement.
- One row per physical Park Equipment or Other Load branch, with migration of former schema-4 quantities into separate schema-5 rows.
- First-class 120/240V single-phase and 208Y/120V three-phase workflows, including 50A two-pole RV-site phase assignments on three-phase systems.
Calculation and documentation workflow
- Seven steps: Project, Distribution, RV Site Distribution, Park Equipment, Other Loads, Results, and One-Line.
- Service, feeder, panel, transformer, transformer-secondary, pedestal, site-assignment, Park Equipment, and Other Load results and schedules as applicable to the selected mode.
- Automatic primary-phase balancing for applicable single-phase transformers and explicit integral or remote first-secondary-main topology.
- Remote transformer-secondary segments through 25 ft with 10 ft / 25 ft rule identification, supply-side bonding-jumper planning, and source-OCPD continuity.
- Supported-method conductor, full-size neutral, EGC, raceway-fill, and phase-loading planning, including Chapter 9 Table 9 raceway impedance and joint 3% terminal / 5% complete-path voltage-drop coordination.
- Required protective-feature scheduling by One-Line tag, including modeled GFPE and arc-energy-reduction thresholds.
- Service grounding-electrode-conductor and main-bonding-jumper planning, plus transformer grounding and bonding results for applicable large-park configurations.
- Tagged source-to-load one-lines, schema-versioned
.rvpproject files, local draft recovery, and coordinated branded PDF reports.
Customer delivery and licensing
- Setup and Portable builds for Windows 10 or Windows 11, 64-bit.
- One 365-day term beginning at the original Gumroad purchase timestamp, with no automatic renewal.
- Online activation and periodic validation, normally every 30 days, with up to three device activations unless the purchased quantity grants more.
- Encrypted local activation record; project-file and report contents are not sent as part of Gumroad validation.